Contracting opportunities 
WW-628: Southeast Plant New Headworks Facility Project – Trade Packages




By posting Prime Bidders' requests for subcontracting opportunities, SFPUC makes no representations to the reader that the listed Prime Bidders are qualified or authorized to advertise services as licensed contractors.

  Description
 
  • Contact: David Cooley dcooley@sundt.com

  • Speciality: Request for Proposals for Scope III Bid Solicitation 1 SFPUC - Southeast Plant New Headworks Construction ADVERTISEMENT FOR SUBCONTRACTOR PROPOSALS Subject to conditions prescribed by the City and County of San Francisco, CA responses to this bid request are sought from subcontractors for Survey, Dust Control, Street Sweeping, SWPPP and Inspections, Potholing, Site Services and Safety Railing, Temp Fencing, Site Security, Trade Resource Reporting System, Traffic Control and Flagging, Tower Cranes, Demolition of Remaining Headworks, Structural Concrete, Shoring-Dewatering-Excavation and Haul Off, Drilled Shafts and Inclinometers, Underslab Piping-Yard Pipe-Storm Drains and Manholes. PROJECT DESCRIPTION: The intent of this project is to replace the existing Headworks Facility at the SE Water Pollution Control Plant with a new all-weather 250 MGD Headworks Facility. This solicitation is for Scope III New Headworks Construction. SCOPE / DRAWINGS: The drawings for Scope III are included in the Plan Room on Smartbidnet.com. The scopes being sought for this project are as follows: 3-1 - Survey - 60% LBE Requirement 3-2 - Dust Control - 60% LBE Requirement 3-3 - Street Sweeping - Concrete Pads, Demo, Bollards - 60% LBE Requirement 3-4 - SWPPP Inspections- 60% LBE Requirement 3-5 - Potholing - 20% LBE Requirement 3-6 - Site Services and Safety Railing - 60% LBE Requirement 3-7 - Temp Fencing - 60% LBE Requirement 3-8 - Site Security - 60% LBE Requirement 3-9 - Trade Resource Reporting System - 0% LBE Requirement 3-10 - Traffic Control / Flagging - 60% LBE Requirement 3-11 - Tower Cranes - 0% LBE Requirement 3-12 - Demolition of Remaining Headworks - 20% LBE Requirement 3-13 - Structural Concrete (including rebar) - 20% LBE Requirement 3-15 - Shoring, Dewatering, Excavation and Haul Off - 20% LBE Requirement 3-16 - Drilled Shafts and Inclinometers - 20% LBE Requirement 3-17 - Underslab Piping, Yard Pipe, Storm Drains and Manholes - 20% LBE Requirement

  • Record created: 01/15/19

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Roofing Contractor. Micro-Owned San Francisco LBE and Minority-Owned San Francisco LBE for Construction & Building Materials and supplies, steel & steel products.

  • Speciality: Ulises Avila Cell: (650) 716-9690 Phone: (628) 444-3610 email: ulises@sfroofingservices.com

  • Record created: 12/18/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Ulises Avila Cell: (650) 716-9690 Phone: (628) 444-3610 email: ulises@sfroofingservices.com

  • Speciality: Roofing Specialists We are also Micro LBE and Minority LBE

  • Record created: 12/18/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Sundt/Walsh, A Joint Venture David Cooley dcooley@sundt.com

  • Speciality: Request for Proposals for Scope IIA Rebid of Packages Bruce Flynn Pump Station Modifications ADVERTISEMENT FOR SUBCONTRACTOR PROPOSALS Subject to conditions prescribed by the City and County of San Francisco, CA responses to this bid request are sought from subcontractors for Doors, Paints and Coatings, Concrete Pads, Demo, Bollards, Project Cleanup, Traffic Control and Tree Pruning. PROJECT DESCRIPTION: The intent of this project is to replace the existing Headworks Facility at the SE Water Pollution Control Plant with a new all-weather 250 MGD Headworks Facility. This solicitation is for Scope IIA Bruce Flynn Modifications. Scope IIA – Pump Station Modifications Primary focus of this Scope is to replace pumps and bar screens in the Bruce Flynn Pump Station. Work also includes replacing watertight doors, security doors, Odor Control Replacement, conversion from electric actuated system to a hydraulic system, electrical, instrumentation and security. SCOPE / DRAWINGS: The drawings for Scope IIA are included in the Plan Room on Smartbidnet.com. The scopes being sought for this project are as follows: 2A-4 - Doors - 60% LBE Requirement 2A-5 - Paints and Coatings - 60% LBE Requirement 2A-6 - Concrete Pads, Demo, Bollards - 85% LBE Requirement 2A-7 - Project Cleanup - 85% LBE Requirement 2A-9 - Traffic Control - 85% LBE Requirement 2A-11 - Tree Pruning - 85% LBE Requirement PROJECT SCHEDULE: Currently this work is scheduled to commence in the Fall of 2018. PRE-QUALIFICATION OF PROSPECTIVE SUBCONTRACTORS: The Owner has determined that subcontractors who submit bids to Sundt/Walsh on this Project must be pre-qualified. Those subcontractors who pre-qualify will be allowed to bid on the above Scope of Work. Interested firms may obtain Pre-qualification Documents on the Smartbidnet.com website or by contacting David Cooley, via e-mail at dcooley@sundt.com. All prequal documentation must be submitted by

  • Record created: 11/21/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Monterey Mechanical bidding as HVAC subcontractor is requesting sub bids/quotes from San Francisco Small & Micro-LBE's (CMD certified) and others for the trades listed. Contact Raul Jaime @ r.jaime@montmech.com - call 510-632-3173 - fax 510-632-0732

  • Speciality: HVAC Demolition, Equipment Rental, BIM Modeling, Miscellaneous Metals

  • Record created: 06/22/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Sundt/Walsh, A Joint Venture David Cooley dcooley@sundt.com

  • Speciality: SFPUC – Southeast Plant, New Headworks Project Sundt/Walsh, A Joint Venture is posting the Bid Results for the Re-bid of 3 packages for Scope I. Those bids are as follows: Package 1-200 – Earthwork Kiewit Infrastructure West Co. - $20,781,500.00 Shimmick Construction Company, Inc. - $20,552,000.00 Package 1-300 – Mechanical / Piping Shimmick Construction Company, Inc. - $4,068,500.00 Western Water Constructors, Inc. - $6,790,000.00 Package 1-800 – Gate Marinship Development Interest, LLC - $106,100.00

  • Record created: 06/12/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Sundt/Walsh, A Joint Venture David Cooley dcooley@sundt.com

  • Speciality: SFPUC New Headworks Project Request for Proposals for Scope I Traffic Control ADVERTISEMENT FOR SUBCONTRACTOR PROPOSALS Subject to conditions prescribed by the City and County of San Francisco, CA responses to this bid request are sought from subcontractors. PROJECT DESCRIPTION: The intent of this project is to replace the existing Headworks Facility at the SE Water Pollution Control Plant with a new all-weather 250 MGD Headworks Facility. This solicitation is for Scope I Traffic Control. Scope I - Traffic Control: Provide traffic control devices, plans, etc. as detailed in the preliminary Traffic Control Plan. SCOPE / DRAWINGS: The drawings for Scope I are included in the Plan Room on Smartbidnet.com. The scope being sought for this project is: 1-1100 - Traffic Control - 15% LBE Requirement PROJECT SCHEDULE: Currently this work is scheduled to commence in the Summer/Fall of 2018. PRE-QUALIFICATION OF PROSPECTIVE SUBCONTRACTORS: The Owner has determined that subcontractors who submit bids to Sundt/Walsh on this Project must be pre-qualified. Those subcontractors who pre-qualify will be allowed to bid on the above Scope of Work. Interested firms may obtain Pre-qualification Documents on the Smartbidnet.com website or by contacting David Cooley, via e-mail at dcooley@sundt.com. All prequal documentation must be submitted by July 13, 2018. LOCAL BUSINESS ENTERPRISE (LBE) REQUIREMENTS: The following project-wide LBE participation requirement is: LBE-15%. The Bid Package has a specific LBE requirement as indicated above. Any proposals that fail to meet the Bid Package LBE requirement may be deemed non-responsive. DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS: All subcontractors are hereby notified that it is expected that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (SRF), administered by the United States Environmenta

  • Record created: 06/08/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Sundt/Walsh, A Joint Venture David Cooley dcooley@sundt.com

  • Speciality: Request for Proposals for Scope IIA Bruce Flynn Pump Station Modifications ADVERTISEMENT FOR SUBCONTRACTOR PROPOSALS Subject to conditions prescribed by the City and County of San Francisco, CA responses to this bid request are sought from subcontractors for various Work Packages/Scopes. PROJECT DESCRIPTION: The intent of this project is to replace the existing Headworks Facility at the SE Water Pollution Control Plant with a new all-weather 250 MGD Headworks Facility. This solicitation is for Scope IIA Bruce Flynn Modifications. Scope IIA – Pump Station Modifications Primary focus of this Scope is to replace pumps and bar screens in the Bruce Flynn Pump Station. Work also includes replacing watertight doors, security doors, Odor Control Replacement, conversion from electric actuated system to a hydraulic system. SCOPE / DRAWINGS: The drawings for Scope IIA are included in the Plan Room on Smartbidnet.com. The scopes being sought for this project are as follows: 2A-1 - Equipment and Piping Installation - 15% LBE Requirement 2A-2 - HVAC Duct and Odor Control Installation - 15% LBE Requirement 2A-3 - Traffic Topping - 15% LBE Requirement 2A-5 - Paint and Coatings - 60% LBE Requirement 2A-6 - Concrete Pads, Demo, Bollards - 85% LBE Requirements 2A-7 - Project Cleanup - 85% LBE Requirement 2A-8 - Site Security - 85% LBE Requirement 2A-9 - Traffic Control - 85% LBE Requirement 2A-10 - Plumbing - 60% LBE Requirement 2A-11 - Tree Prunning - 85% LBE Requirement 2A-12 - Trade Resource Reporting System -0% LBE Requirement 2A-13 - Pump Procurement - 0% LBE Requirement 2A-14 - Odor Control Equipment Procurement - 0% LBE Requirement 2A-15 - Flexible Rake Bar Screen Procurement - 0% LBE Requirement PROJECT SCHEDULE: Currently this work is scheduled to commence in the Summer/Fall of 2018. PRE-QUALIFICATION OF PROSPECTIVE SUBCONTRACTORS: The Owner has determined that subcontractors who submit bids t

  • Record created: 06/08/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: josh@armourfence.com (415) 545-8910

  • Speciality: SUBCONTRACTING SPECIALTIES REQUIRED Armour Fence requests bids from certified SF Contract Monitoring Division (CMD) Small and Micro-LBEs, CUCP and SBA certified Disadvantaged Business Enterprises (DBE) Suppliers seeking to participate in the SFPUC, SEWPCP New Headworks Facility Scope 1 Site Preparation Project in San Francisco, CA. http://www.sfgov.org/cmd / http://www.epa.gov / http://www.sba.gov / www.californiaucp.org Small/Micro Local Business Enterprises (LBEs) Disadvantaged Business Enterprises (DBEs) Disabled Veteran Business Enterprises (DVBE), Minority Business Enterprises (MBE), Women Business Enterprises (WBE), Small Business Enterprises (SBE), Small Businesses in a Rural Area (SBRA), Labor Surplus Area Firms (LSAF), or Historically Underutilized Business (HUB) Zone Businesses wanted for the following scopes, including, but not limited to: Furnishing of gate materials. Supplier Quotes are due May 7, 2018. Clean Water State Revolving Fund (CWSRF) Provisions apply Project Labor Agreement applies Prevailing Wage apply.

  • Record created: 04/13/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Josh@armourfence.com (415) 545-8910

  • Speciality: Temp Fence Permanent Fence

  • Record created: 04/13/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
BACK TO CONTRACTS & BIDS LIST

Contact Information

  • SFPUC - Contracts Administration Bureau
  • 525 Golden Gate Avenue, 8th Floor
  • San Francisco, CA 94102
  • Phone: (415) 551-4603; Fax: (415) 554-3225
  • Email: CAB@sfwater.org