Contracting opportunities 
WD-2822R: Lower Crystal Springs Dam Stilling Basin Connecting Channel - BID TABULATION




By posting Prime Bidders' requests for subcontracting opportunities, SFPUC makes no representations to the reader that the listed Prime Bidders are qualified or authorized to advertise services as licensed contractors.

  Description
 
  • Contact: Sarah Maudlin Thompson Builders Corp. 250 Bel Marin Keys Blvd., Bldg A Novato, CA 94949 P: 415-459-8972 F: 415-459-0665 sarahm@tbcorp.com

  • Speciality: Thompson Builders Corp. DIVISION 1 – GENERAL REQUIREMENTS - SUMMARY OF WORK; ACCESS TO SITE; PRICE AND PAYMENT PROCEDURES; MOBILIZATION ITEM; PRODUCT SUBSTITUTION PROCEDURES; SCHEDULE OF VALUES; PROJECT MANAGEMENT AND COORDINATION; PROJECT MEETINGS; CONSTRUCTION PROGRESS SCHEDULE; SURVEYING; SUBMITTAL PROCEDURES; ENVIRONMENTAL PROCEDURES; CONTAMINATED SOILS IN EXCAVATION; REGULATORY REQUIREMENTS; EXCAVATION PERMIT REQUIREMENTS (OUTSIDE S.F.) REFERENCES; QUALITY CONTROL; TEMPORARY FACILITIES AND CONTROLS; FIELD OFFICES; TEMPORARY NOISE AND VIBRATION CONTROLS; STORM WATER POLLUTION PREVENTION, EROSION/SEDIMENT CONTROL; PRODUCT REQUIREMENTS; OWNER FURNISHED PRODUCTS; SHUTDOWNS AND SITE ACCESS; PROTECTION OF ADJACENT CONSTRUCTION; SEISMIC REQUIREMENTS FOR MECHANICAL AND ELECTRICAL EQUIPMENT; CONSTRUCTION & DEMOLITION DEBRIS RECOVERY PLAN AND REPORTING EQUIPMENT; TESTING COORDINATION AND START-UP TESTING; CLOSEOUT PROCEDURES; OPERATIONS AND MAINTENANCE DATA; WARRANTIES; PROJECT RECORD DOCUMENTS. DIVISION 2 THROUGH 48 – TECHNICAL SPECIFICATIONS. DIVISION 3-CONCRETE – CONCRETE FORMING; CONCRETE REINFORCING; CAST-IN-PLACE CONCRETE; GROUTING. DIVISION 9 – FINISHES –COATING AND LINING. DIVISION 15 – LINESTOP – LINESTOP. DIVISION 22 – PLUMBING – GENERAL REQUIREMENTS FOR PLUMBING; IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT. DIVISION 26 – ELECTRICAL – GENERAL REQUIREMENTS FOR ELECTRICAL; COMMON WORK RESULTS FOR ELECTRICAL; LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES; RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS; PGRS CONDUIT AND SYSTEM COMPONENTS; UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS; IDENTIFICATION FOR ELECTRICAL SYSTEMS; COMMISSIONING OF ELECTRICAL SYSTEMS; CORROSION CONTROL. DIVISION 27 – COMMUNICATIONS - COMMON WORK RESULTS FOR COMMUNICATIONS; IDENTIFICATION FOR COMMUNICATIONS SYSTEMS; COMMISSIONING OF COMMUNICATIONS. DIVISION 31 – EARTHWORK – EARTHWORK; CONTROLLED LOW STRENGTH MATERIAL. DIVISION 32 – EXTERIOR IMPROVEMENTS - RIPRAP; EROSION CONTROL; IRRIGATION; PLANTING; PLANT MAINTENANCE. DIVI

  • Record created: 01/22/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
  • Contact: Pacific Bay Builders, Inc. 501 Cesar Chavez Street Suite 107A San Francisco, CA 94124 (415) 285-2166 (phone) (415) 285-2168 (fax) estimating@pacbaybuilders.com CONTACT: Herman Young

  • Speciality: Looking for SF Contract Monitoring Division certified LBE (small & micro) suppliers and subcontractors for the Lower Crystal Springs Dam Stilling Basin Connecting Channel Project (Contract No. WD-2822R) The project's LBE goal is set at 8.00%. Scopes of work: Concrete, Coating and Lining and Electrical.

  • Record created: 01/19/18

  • ----------------------------------------------------------------------------------------------------------------------------------------------------------------
BACK TO CONTRACTS & BIDS LIST

Contact Information

  • SFPUC - Contracts Administration Bureau
  • 525 Golden Gate Avenue, 8th Floor
  • San Francisco, CA 94102
  • Phone: (415) 551-4603; Fax: (415) 554-3225
  • Email: CAB@sfwater.org