Final Pilarcitos Report
Published: 10/20/2006
| Updated: 10/20/2006
Published By: Land and Natural Resources Division
Published By: Land and Natural Resources Division
At the request of the San Francisco Public Utilities Commission, Kennedy/Jenks Consultants has prepared this report summarizing water management operations for the Pilarcitos watershed area. The report incorporates results of related studies assess the aquatic habitat and fish passage conditions within Pilarcitos Creek, upstream and downstream of Stone Dam, and identify options for improvement. These studies are included full as appendices to the report. Specifically:
- Appendix A: Pilarcitos Creek Aquatic Habitat and Fish Population Survey, September 2004 (ENTRIX, Inc. [ENTRIX] 2005)
- Appendix B: Evaluation of Flow-Habitat Relationships in Pilarcitos Creek Downstream of Stone Dam (ENTRIX 2005)
- Appendix C: An Analysis of Sediment Mobilization in Pilarcitos Creek (ENTRIX 2005)
Attachments: (Help)



