Published By: Contract Administration Bureau
The SFPUC has implemented a pre-qualification program to determine bidder responsibility prior to submission of bids for select projects. Bidders for designated construction projects must be pre-qualified prior to submitting bids. It is mandatory that all Licensed Contractors who intend to submit bids for these designated projects, fully complete the Pre-Qualification Questionnaire: Request for Qualifications - Parts I, II, and III as well as the Technical Requirements: Request for Qualifications - Part IV for the applicable project category(s) provide all materials requested herein, and be approved by SFPUC as a qualified bidder.
Pre-qualification application packages may be submitted at any time throughout the year. The SFPUC requires a minimum of 30 days to process a pre-qualification application following submittal of all required documents, including timely receipt of Reference Questionnaires. Notice of “Qualified Contractors” will be posted on the SFPUC website (www.sfwater.org) and will be updated on the 1st and 15th of each month. Pre-Qualification approval will remain valid for two (2) calendar years from the posted approval date.
Request for Qualifications Parts I, II, and III
For Technical Requirements: Request For Qualifications (RFQ) Part IV, see the respective link under each Project Category below. Please be advised that Estimated Advertisement Dates and Estimated Contract Values may be subject to change. Contractors are advised to check this webpage regularly for updates.
SFPUC Wastewater Projects |
Estimated Contract Value* |
Estimated Advertisement Date* |
|
SEWER PIPELINES |
||
|
Staples/Hazelwood/Montecito Sewer Improvement |
$5-$10M |
January 2008 |
|
Cesar Chavez Sewer Improvement, Phase 1 |
$5-$10M |
January 2008 |
|
Ocean Ave Sewer Improvement |
$5-$10M |
March 2008 |
|
Sunnydale Auxiliary Sewer |
$10-$25M |
March 2008 |
|
Alemany & Sickles Sewer Improvement |
$1-$10M |
May 2008 |
|
WASTEWATER TREATMENT FACILITIES RFQ Part IV - WWTrtmt |
||
|
Major Mechanical and Electrical Equipment Replacement |
$1-$10M |
March 2008 |
|
SEP 010 Odor Control |
$1-$10M |
May 2008 |
|
OSP Digester Mixing Improvements |
$1-$10M |
January 2009 |
|
WASTEWATER PUMP STATIONS RFQ Part IV - WWPS |
||
|
Tennessee Pump Station Phase I |
$1-$10M |
March 2008 |
|
Chemical Feed Systems Phase II |
$1-$10M |
March 2008 |
|
Embarcadero Box Hydraulic Modifications |
$1-$10M |
April 2008 |
|
SWOO Cleaning and Backflow Prevention |
$1-$10M |
April 2008 |
|
Tennessee Pump Station Phase II |
$1-$10M |
November 2008 |
SFPUC Local Water Projects |
Estimated Contract Value* |
Estimated Advertisement Date* |
|
SMALL (< 48 “) WATER PIPELINES |
||
|
North University Mound System Upgrade |
$12M |
February 2008 |
|
Noe Valley Transmission Main, Phase 2 |
$8M |
July 2008 |
|
San Andreas Pipeline No. 3 Installation |
$30M |
March 2009 |
|
City Distribution Division - Ductile Iron Main Replacement |
$1 - $3M |
Approx. 6 per year |
|
WATER PUMP STATIONS AND TANKS |
||
|
Mount Davidson Pump Station and Storage Tank Upgrades |
$5M |
January 2008 |
|
Vista Francisco Pump Station Upgrades |
$4M |
July 2008 |
|
Lake Merced Pump Station Essential Upgrades |
$57M |
August 2008 |
|
La Grande Pump Station Upgrades |
$4M |
March 2009 |
|
Forest Hill Pump Station Upgrades |
$4M |
January 2010 |
|
WATER RESERVOIRS |
||
|
University Mound Reservoir Upgrades – North Basin |
$43M |
June 2008 |
|
Sutro Reservoir Rehab & Seismic Upgrade |
$30M |
August 2009 |
SFPUC Regional Water Projects |
Estimated Contract Value* |
Estimated Advertisement Date* |
|
WATER TUNNELS |
||
|
New Crystal Springs Bypass Tunnel |
$68M |
June 2008 |
|
Bay Division Reliability Upgrade – Bay Tunnel |
$269M |
August 2008 |
|
LARGE (> 48”) PIPELINES |
||
|
Alameda Siphon # 4 |
$42M |
June 2008 |
|
Bay Division Pipeline Reliability Upgrade- Pipeline |
$184M |
October 2008 |
|
Crystal Springs Pipeline No. 2 Replacement |
$46M |
July 2009 |
|
San Antonio Backup Pipeline |
$16M |
August 2009 |
|
San Joaquin Pipeline System |
$200M |
December 2010 |
|
VALVE LOTS RFQ Part IV - RWVL |
||
|
Baden and San Pedro Valve Lots Improvements |
$21M |
October 2008 |
|
BDPL No. 3 & 4 – Crossovers |
$25M |
October 2008 |
|
New San Joaquin Pipeline Crossovers |
$10M |
October 2009 |
|
WATER TREATMENT PLANTS |
||
|
SVTWP Expansion & Treated Water Reservoir |
$105M |
April 2009 |
|
HTWTP Long-Term Improvements |
$130M |
October 2010 |
STRUCTURAL UPGRADES/RETROFITS |
||
|
San Antonio Pump Station Upgrade |
$9M |
December 2008 |
|
Pulgas Balancing Reservoir Rehabilitation |
$13M |
April 2009 |
|
Lower Crystal Springs Dam Improvements |
$17M |
July 2009 |
|
Pulgas Discharge Channel Modifications |
$5M |
October 2009 |
Stand Alone Regional Water Projects** |
Estimated Contract Value* |
Estimated Advertisement Date* |
|
Calaveras Dam Replacement |
$232M |
September 2008 |
|
New Irvington Tunnel |
$263M |
June 2009 |
|
SCADA System |
$11M |
July 2009 |
|
Groundwater Sub-Project B – North Westside Basin Wells |
$21M |
March 2010 |
|
Crystal Springs/San Andreas Transmission Upgrade |
$114M |
April 2010 |
|
Recycled Water Project |
$102M |
May 2010 |
|
Watershed Environmental Improvement Program |
$15M |
July 2010 |
|
Groundwater Sub-Project C – Conjunctive Use |
$26M |
August 2010 |
|
Groundwater Sub-Project A – Lake Merced Water Levels |
$10M |
October 2010 |
|
Seismic Upgrade of BDPLS No. 3 & 4 @ Hayward Fault |
$43M |
December 2010 |
|
Alameda Creek Fishery Enhancement |
$11M |
April 2012 |
* Estimated Contract Values and Estimated Advertisement Dates may be subject to change.
**A separate pre-qualification process with project-specific Request for Qualifications will be conducted for each SFPUC Stand Alone Regional Water Project. Links to the RFQ will be issued 3-6 Months prior to the Estimated Advertisement Date.
Potential bidders are encouraged to submit pre-qualification packages as soon as possible, so that they may be notified of pre-qualification status well in advance of upcoming projects.
For listing of SFPUC approved pre-qualified contractors, click below:
SFPUC Pre-Qualified Contractors
For questions on pre-qualification, please send an email to: prequal@sfwater.org or leave a voicemail at 415.551.4603.