5-Year Wastewater CIP 3rd Quarter Report Fiscal Year 07-08
Published: 07/01/2008  |  Updated: 08/01/2008
Published By: Communications and Public Outreach

The Five-Year Wastewater Capital Improvement Program (5-Year CIP) addresses
immediate wastewater needs in the areas of flood control, odor control, and aging
facilities. The 5-Year CIP is a parallel effort to the Sewer System Master Plan, which is
a long-term plan to address the City’s wastewater needs for the next 30 years. In the
past two and half years, the 5-Year CIP improved the reliability and efficiency of our
wastewater system by:

• Maximizing collection and conveyance of sewage and storm water;
• Protecting public health and safety;
• Maximizing control of odor emissions;
• Improving reliability of critical treatment facilities; and
• Reducing future repair and replacement costs.

The projects identified in the 5-Year CIP are divided into two major categories:

1) Sewer Improvement Projects; and
2) Aging Infrastructure and Odor Control Projects.

As of March 2008, there are 17 projects under the Sewer Improvement category with
an approximate spending plan of $84.5M, and there are 24 projects under the Aging
Infrastructure and Odor Control category with an approximate spending plan of
$74.6M. Since the last Quarterly Report, two projects have been added and the
number of active projects is thirty-five. The project phase summary and project status
are shown on Table 2.3 and explained in Section 2.3.

The 5-Year CIP program is within budget and generally on schedule. The program
continues to experience high construction bid prices and limited bidders in the
treatment facility projects. Despite the challenges, the program has made substantial
progress and over 65% of the projects are in construction or have been completed.
Additional funding for the program had been requested to supplement funding of
several remaining large projects, and to allow for the initiation of some key projects
prior to implementation of the Master Plan.



Attachments: (Help)
pdf attachment WWE 5-Year CIP Qrtly Report ’07-’08 – 3rd Qrtr - Overview, Background (464 KB)
pdf attachment WWE 5-Year CIP Qrtly Report ’07-’08 – 3rd Qrtr – Sewer Improvement (397 KB)
pdf attachment WWE 5-Year CIP Qrtly Report ’07-’08 – 3rd Qrtr – Aging Infrastructure - Odor Control (470 KB)
pdf attachment WWE 5-Year CIP Qrtly Report ’07-’08 – 3rd Qrtr – Appendix (62 KB)



 
 
Visit sfgov.org the official site of the City and County of San Francisco
Copyright © 2008, San Francisco Public Utilities Commission

Privacy Policy  |   SFPUC Home  |   Site Index  |   Contact: Email & Phone