Advanced Search   
SFPUC Home   |   Site Index   |   Contact: Email & Phone   




 
On Line Bids and RFPs
Documents for RFP for Design Build Services for Tesla Treatment Facility Project
 
Document
title
Document
added

DB-116 RFP Evaluation Scores & Results 9/15/2008 at 2:53 PM
DB-116 RFP - Addendum No. 6 8/13/2008 at 12:50 PM
DB-116 RFP - Addendum No. 5 8/6/2008 at 4:46 PM
DB-116 Q&A Part 8 8/1/2008 at 3:57 PM
DB-116 RFP - Addendum No. 4 7/30/2008 at 8:58 AM
DB-116 Q&A Part 7 7/25/2008 at 2:36 PM
DB-116 RFP - Addendum No. 3 7/23/2008 at 3:18 PM
DB-116 RFP: Appendix C - Reference Documents, Rev2 7/14/2008 at 3:50 PM
DB-116 Q&A Part 6 7/11/2008 at 4:41 PM
DB-116 RFP - Addendum No.2 7/9/2008 at 1:18 PM
Questions/Comments on DB-116 Agreement 7/2/2008 at 2:45 PM
DB-116 Q&A Part 5 6/18/2008 at 3:46 PM
DB-116 Q&A Part 4 6/10/2008 at 3:23 PM
DB116 Q&A Part 3-rev1 (replaces Q&A Part 3 in its entirety) 6/10/2008 at 3:06 PM
DB116 Q&A Part 2-rev2 (replaces Q&A Part 2-rev1 in its entirety) 6/10/2008 at 3:04 PM
DB-116 RFP - Addendum 1 5/23/2008 at 1:52 PM
DB-116 Q&A Part 3 5/23/2008 at 1:23 PM
DB116 Q&A Part 2-rev1 (replaces Q&A Part 2 in its entirety) 5/14/2008 at 2:35 PM
DB-116 Q&A Part 2 5/13/2008 at 4:44 PM
DB-116 Pre-Proposal Meeting Sign-In Sheet 5/5/2008 at 11:11 AM
DB-116 Q&A R1 4/25/2008 at 8:56 AM
DB-116 Q&A 4/14/2008 at 3:47 PM
DB-116 RFP: Appendix C - Reference Documents(rev.09Apr08) 4/9/2008 at 4:34 PM
DB-116 RFP - Design Build Services for Tesla Treatment Facility 4/8/2008 at 4:04 PM
DB-116 RFP: Appendix A - Proposal Related Documents 4/8/2008 at 4:02 PM
DB-116 RFP: Appendix B - Contract Related Documents 4/8/2008 at 4:01 PM
 

Login or register to download bid documents or submit a request for interest from HRC-certified LBE subcontractors.
If you have ever downloaded documents for any project, enter your email address and click the login button. Email address:

Register with us if you have never downloaded documents for any project. To register click the registration button and complete the form on the next page that you see. After you are properly registered you can download documents for projects without registering again.
 


By posting Prime Bidders' requests for subcontracting opportunities, SFPUC makes no representations to the reader that the listed Prime Bidders are qualified or authorized to advertise services as licensed contractors.
Registered (LBE) Subcontractor Request: Required Specialities: CDM/Monterey Mechanical a Joint Venture will be submitting a proposal for Design-Build Services for the Tesla Treatment Facility, located in Tracy, California. Consequently, the project design will not be complete until after the project is awarded. We anticipate Plans and Specifications for this project to be available during the 4th quarter of 2008 at which time we will invite all HRC certified LBE's and others to submit a sub bid or material quote. At this time, please fax or e:mail your letter of interest on or before August 6, 2008, for the following types of work: Construction Surveying; Quality Control, Final Cleaning/Concrete Sawing; Clearing & Grubbing; Earthwork, Exc/Backfill Material; Trucking; Sand & Gravel; Paving/Grading/Concrete; Curbs, Gutters & Sidewalk; Pavement Striping & marking; Irrigation Systems; Landscaping, Hydromulch/Erosion Control; Precast Concrete; Fences & Gates; Concrete Formwork, Concrete Placement; Reinforcing Steel; Ready-Mix Concrete Material; Concrete Pumping; Structural Steel; Metal Decking; Metal Fabrication, Misc.; Handrails, Railings; Finish Millwork, Cabinets; Plastic Fabrications/Gratings; Waterproofing; Insulation; Roofing, Membrane Roofing; Roof Accessories; Skylights; Caulking & Sealants; Metal Doors & Frames; Special Doors; Roll-Up Doors; Aluminum Entrances, Storefronts; Metal Windows; Hardware; Glass & Glazing; Lath & Plaster, Drywall; Ceramic Tile; Acoustical Ceilings; Resilient Flooring; Painting, Decorating; Louvers & Vents; Identification Markers; Lockers; Fire Protection Specialties; Storage Shelves; Toilet & Bath Accessories; Laboratory Equipment; Laboratory Casework; Laboratory Furnishings; FRP Building; Fire Protection; Plumbing; Pipe/Valves, Welding; Corrosion Control; Electrical; Instrumentation
Contact Information: Debra Paraiso, 510-632-3173 x135, 510-636-4335 or fax (510)632-0761, d.paraiso@montmech.com (This was created on 7/10/2008 and last updated on 7/22/2008.)

Registered (LBE) Subcontractor Request: Required Specialities: Design Services Request for Certified LBE (WBE/MBE/OBE) firm for cost proposals from qualified and certified subcontractors/vendors for Design Services for the construction of the Tesla Treatmetn Facility. Scope of work for design services include genotechnical engineering; landscape architecture/design; site civil design; document reproduction; and QC material testing.
Contact Information: Contact: PCL Civil Constructors, Inc., 1711 W. Greentree Dr., Ste. 201, Tempe, AZ 85284 (480)829-6333; fax: (480)829-8252, Glen Lamoreaux (Lead Estimator) GLamoreaux@pcl.com; or Betsy Hitt, bhitt@pcl.com. (This was created on 7/10/2008.)

Registered (LBE) Subcontractor Request: Required Specialities: Electrical
Contact Information: Please advise when we can expect to see Electrical Specifications and Plans. Specifically looking for Diesel Generators, Paralleling Gear and Automatic Transfer Switch equipment. (This was created on 7/4/2008.)

Registered (LBE) Subcontractor Request: Required Specialities: Prospective bidder CDM/MM a Joint Venture seeks HRC-certified LBE subcontractors in the following professional service areas: CAD Services, Civil Engineering, Electrical Engineering, Geotechnical Engineering, Laboratory Services (Materials Testing), Mechanical Engineering, Structural Engineering, Surveying (Land & Aerial), Water Resources Engineering. CDM/MM a Joint Venture is pursuing an opportunity with the SFPUC, in particular, Design Build Services for Tesla Treatment Facility Project (DB-116) due 8/7/08. As part of our ongoing efforts of outreach and partnership with LBE firms, we are seeking firms with relevant experience on similar types of projects. Interested HRC-certified LBE firms are requested to contact us to provide qualifications and background on your firm.
Contact Information: Please Contact Vanessa Asis (preferably by email with DB-116 in the subject line) by close of business on July 18, 2008 at Asisvf@cdm.com or (925) 933-2900. (This was created on 6/30/2008 and last updated on 7/1/2008.)

Registered (LBE) Subcontractor Request: Required Specialities: Design Build opportunities Construction Management Services Sewer Pipeline rehabilitation Storm Drain Pipes Water Pipes Cured In Place Liners (CIPP)
Contact Information: Fuad Sweiss Cell (925) 395-3846 or Fuad.Sweiss@gmail.com (This was created on 6/21/2008.)

Registered (LBE) Subcontractor Request: Required Specialities: Demo/Clear/Grub; Excavation/Backfill; Survey; Aggregates; Asphalt Paving; Pavement Striping/Markings; Fuel/Oil/Gas; Geotechnical Survey; Quality Control; Materials Testing; Security Guards; Trucking; Fencing; Erosion Control; Landscape/Irrigation/Hydro-Seeding; Concrete Supply; Concrete Flatwork; Concrete Reinforcing; Concrete Formwork; Concrete Placing; Manholes/Covers/ Vaults/Catch Basins; Pre-cast Concrete Structures; Misc. Metals; FRP Gratings; Structural Steel; Pipe Supply –Steel/Plastic/PVC; PVC Lining; Pipeline Corrosion Control; Pipeline Disinfection; Utility Pipe Fittings; Welding; Pumps/Valves; Fire Sprinklers / Extinguishers; HVAC/Plumbing; Painting/Special Coatings; Waterproofing Sealants; Pre-fab Buildings; Roofing; Rough Carpentry; Acoustical Tile; Cabinetry; Doors/Windows/Hardware; Drywall; Flooring-Tile/Vinyl; Lab Casework; Kitchen Appliances; Toilet & Bath Accessories; Electrical and Instrumentation.
Contact Information: Glen Lamoreaux @ (480)763-2753 glamoreaux@pcl.com Betsy Hitt @(480)763-2746 bhitt@pcl.com (This was created on 6/11/2008.)



 
 
Visit sfgov.org the official site of the City and County of San Francisco
Copyright © 2008, San Francisco Public Utilities Commission

Privacy Policy  |   SFPUC Home  |   Site Index  |   Contact: Email & Phone