Bid Details
WW-530(I)R
Oceanside Water Pollution Control Plant - Adjustable Frequency Drive Upgrade (Re-Bid) - BID TABULATION

Bid due

05/17/2012
2:00 PM

  • Type Construction
  • Department Infrastructure
BACK TO CONTRACTS & BIDS LIST
Project Description

Bidders are hereby advised that the subject contract will be re-bid as WW-530(I)R using the existing plans, specifications and addenda.  Plan Holders for WW-530(I) do not need to purchase plans and specifications again; their status as Plan Holders will carry over to WW-530(I)R. 

Sealed bids will be received at 1155 Market Street, 1st Floor, (between 7th and 8th Streets), Contract Administration Service Desk, San Francisco, CA 94103, until 2:00 P.M. on May 17, 2012. Hard copy versions of plans, specifications and bidding documents are available at 1155 Market St., 1st Floor, Contract Administration Service Desk, San Francisco, CA 94103 for a non-refundable $50.00 fee paid by cash or by check payable to “SFPUC”.  A CD version is available to paid plan holders for an additional fee of $10.00.  Visit http://sfwater.org/contracts for updates. Call (415) 551-4603 for further information. Please be advised that prior to receiving these materials, all purchasers will be required to complete, sign and fully comply with a Confidentiality Agreement.

The objective of the project is to replace the existing adjustable frequency drive motor equipment at the Oceanside Water Pollution Control Plant with new motor starters or adjustable frequency drives.  The work will also include provisions for all the related conduit, wires, and electrical appurtenances, as well as, selective electrical demolition, electrical testing, instrumentation and control work. In some cases, the project will be a 1:1 unit replacement of the existing adjustable frequency drives with new units. The work is to be performed in San Francisco, California.

Addendum No. 1 was issued March 13, 2012.
Addendum No. 2 was issued March 15, 2012.
Addendum No. 3 was issued March 21, 2012.
Addendum No. 4 was issued March 27, 2012.
Addendum No. 5 was issued April 26, 2012.  Addendum No. 5 advertised the project for re-bid as WW-530(I)R.

The Engineer's estimate is $350,000. The Contract will be awarded to the lowest responsible responsive bidder.

Bid discounts may be applied for certified LBEs as per San Francisco Administrative Code Chapter 14B. The LBE subcontracting goal is 7.00% and ONLY Local San Francisco Small & Micro-LBEs can be utilized to meet this requirement (Local San Francisco Firms certified by SF Human Rights Commission).  SFPUC-LBEs cannot be utilized to meet the subcontracting goal for this project. Please contact Bayard Fong at (415) 554-3103 for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: selective electrical demolition of equipment, and replacing existing adjustable frequency motor drives by furnishing and installing new, more efficient and reliable adjustable frequency drives or motor starters.

 

Request for proposal

  • ESTIMATED COST
    $350,000
  • DUE DATE
    05/17/2012
  • DUE TIME
    2:00 PM
  • DURATION
    240 consecutive calendar days
  • LOCATION
    1155 Market, 1st Floor, Contract Admin Service Desk, SF CA 94103
  • CONTACT
    Contract Administration (415) 551-4603 QBD@sfwater.org

Pre-Bid Conference

  • DATE
    05/08/2012
  • TIME
    9:00 AM
  • ATTENDANCE
    Not Mandatory
  • LOCATION
    Oceanside Water Pollution Control Plant at 3500 Great Highway, SF, CA, Library Conference Room (2nd
  • ADVERTISEMENT DATE
    04/26/2012
LIST OF CERTIFIED LBE FIRMS AT HRC WEBSITE