Search Project
Project List
Records: 61 - 80 of 95
Project List | ||||
| PROJECT TITLE |
DESCRIPTION
|
PROJECT FAMILY
|
LOCATION | |
|
|
Construct new replacement tank; add new inlet/outlet piping |
Water System Improvement Program
|
San Francisco |
|
|
|
Prepare the Programmatic EIR for compliance with CEQA |
Water System Improvement Program
|
System-Wide |
|
|
|
Replace or rehabilitate reservoir’s roof, basin, underdrains, and inlet/outlet piping structure; optimize treatment ops of this unmanned facility. |
Water System Improvement Program
|
Peninsula |
|
|
|
Develop new recycled water project alternatives based on updated Recycled Water Master Plan. |
Water System Improvement Program
|
San Francisco |
|
|
|
Research and develop new electricity generation resources to provide clean, local generation where it is needed. |
Energy,
Environment |
System-Wide |
|
|
|
Install Phase II of a system-wide monitoring and control system for the SFPUC’s water system. |
Water System Improvement Program
|
Bay Division |
|
|
|
Provide facilities for an intertie between the EBMUD and the SFPUC water supply systems. |
Water System Improvement Program
|
Bay Division |
|
|
|
Replace Baden-Merced pipeline; construct 20,800 ft of 42 in diameter steel pipe to extend San Andreas Pipeline No. 3 to SF |
Water System Improvement Program
|
Bay Division |
|
|
|
The proposed San Antonio Backup Pipeline project would transfer the full Hetch Hetchy flow more reliably and efficiently, and backup exisiting line. |
Water System Improvement Program
|
Sunol Valley |
|
|
|
Seismically upgrade pump station, service electric pumps and provide full load backup power generation to Sunol Valley facilities. |
Water System Improvement Program
|
Sunol Valley |
|
|
|
Review existing system and propose a fourth pipeline to provide redundant system hydraulic capacity for routine maintenance. |
Water System Improvement Program
|
San Joaquin |
|
|
|
Address seismic system vulnerabilities in the vicinity of the Hayward Fault |
Water System Improvement Program
|
Bay Division |
|
|
|
This project was designed to improve the collection and transportation of storm water during heavy rains on Shotwell Street (between 17th and 18th Str |
5-Year CIP
|
San Francisco |
|
|
|
Replace deficient structure with new seismic reinforced station; replace aging pumps, motors, controls; add emergency power; improve security |
Water System Improvement Program
|
San Francisco |
|
|
|
Replacement of the existing mixers with 48 new energy efficient mixers and re-coating of 16 clarifiers |
5-Year CIP
|
San Francisco |
|
|
|
Reduce wastewater odors in the Bayview District and maximize energy reuse at the wastewater treatment plant. |
5-Year CIP
|
San Francisco |
|
|
|
Install necessary standby power equipment and supporting infrastructure at identified critical facilities. |
Energy,
Water System Improvement Program |
Sunol Valley, System-Wide |
|
|
|
Upgrade reservoir to meet current seismic standards and conform to all State Health requirements. |
Water System Improvement Program
|
San Francisco |
|
|
|
Addresses areas of the San Francisco served by separate storm sewer collection systems discharging directly to the Bay, Ocean or other inland waters. |
Other
|
San Francisco |
|
|
|
Replace existing deficient structure with new seismically reinforced pump station; and improve site security and water quality monitoring. |
Water System Improvement Program
|
San Francisco |
|
Records: 61 - 80 of 95