Search Project
Project List
Records: 41 - 60 of 95
Project List | ||||
PROJECT TITLE
|
DESCRIPTION
|
PROJECT FAMILY
|
LOCATION | |
|
|
Restore Lake Merced so it can fully serve as an emergency water source for SF fire fighting or sanitation purposes, if no other sources are available. |
Environment,
Other |
San Francisco |
|
|
|
Design and construct water quality treatment upgrades. |
Water System Improvement Program
|
Bay Division |
|
|
|
Lincoln Park Pump Station and Tank Upgrades |
Water System Improvement Program
|
San Francisco |
|
|
|
Construct new transmission line to supply water from Sunset reservoir to the northern and eastern zones. |
Water System Improvement Program
|
San Francisco |
|
|
|
Retrofit existing dam to safely pass maximum flood |
Water System Improvement Program
|
Peninsula |
|
|
|
Rehabilitate and seismically improve McLaren Park Tanks. |
Water System Improvement Program
|
San Francisco |
|
|
|
Make structural and seismic improvements to the Merced Manor Reservoir located on Ocean Avenue between 22nd and 23rd Avenues in S.F. |
Measure A/B
|
San Francisco |
|
|
|
This project was designed to improve the collection and transportation of wastewater during heavy rains on Mission Street and Foote Av |
5-Year CIP
|
San Francisco |
|
|
|
Mission/ Mount Vernon Sewer project will imporve the wastewater flow along Mission Street and on Mount Vernon Avenue. |
5-Year CIP
|
San Francisco |
|
|
|
This project was designed to increase the capacity of the sewer system along Monterey Boulevard. |
5-Year CIP
|
San Francisco |
|
|
|
Rebuild the Mount Davidson pump station; support the Supervisory Control and Data Acquisition (SCADA) project by adding automation where needed. |
Water System Improvement Program
|
San Francisco |
|
|
|
Rebuild Mt. Davidson tank and a cathodic protection and monitoring system. |
Water System Improvement Program
|
San Francisco |
|
|
|
Construct 4,200 ft long, 9 ft diameter tunnel to replace the existing vulnerable Crystal Springs Bypass Pipeline |
Water System Improvement Program
|
Peninsula |
|
|
|
Construct new Irvington Tunnel parallel to existing tunnel with connections for the Alameda Siphons and proposed Bay Division Pipeline. |
Water System Improvement Program
|
Sunol Valley |
|
|
|
Construct 36-inch transmission main to extend the Noe Valley main; and supply Sunset water to eastern portion of the distribution zone. |
Water System Improvement Program
|
San Francisco |
|
|
|
Address supply issues associated with the University Mound system; provide water to downtown areas in case of emergencies. |
Water System Improvement Program
|
San Francisco |
|
|
|
Project to replace the ventilation system and improve treatment processes |
5-Year CIP
|
San Francisco |
|
|
|
Rebuild the Palo Alto Pump Station; facilities to support the Supervisory Control and Data Acquisition project by adding automation where needed. |
Water System Improvement Program
|
Peninsula |
|
|
|
Improve wastewater flow in the area |
5-Year CIP
|
San Francisco |
|
|
|
Develop emergency pipeline repair and operational response plan as well as materials for emergency repairs. |
Water System Improvement Program
|
Sunol Valley |
|
Records: 41 - 60 of 95



