Search Project
Project List
Records: 1 - 20 of 95
Project List | ||||
| PROJECT TITLE |
DESCRIPTION
|
PROJECT FAMILY
|
LOCATION | |
|
|
Address leaks and associated water damage at: (1) Lower Crystal Springs Outlet Tower No. 1 and (2) Calaveras Outlet Tower. |
Water System Improvement Program
|
Peninsula |
|
|
|
Install required infrastructure to recapture water released from Calaveras Reservoir for fishery habitat enhancement. |
Water System Improvement Program
|
Sunol Valley |
|
|
|
Construct a fourth seismically-designed siphon through the Sunol Valley. Seismically retrofit Siphon #2 as needed. |
Water System Improvement Program
|
Sunol Valley |
|
|
|
Manage and maintain Alameda Watershed lands in responsible way, establishing a plan that sets guidelines, pratices for watershed care. |
Environment
|
Bay Division |
|
|
|
Rebuild Alemany Pump Station; and support the Supervisory Control and Data Acquisition (SCADA) project by adding automation. |
Water System Improvement Program
|
San Francisco |
|
|
|
Conduct detailed assessment of PCCP pipeline reaches, identify critically vulnerable sections and prioritize for rehabilitation |
Water System Improvement Program
|
Bay Division |
|
|
|
Add three additional crossover facilities along BDPL 3 and 4; one in Santa Clara, one in Palo Alto and one in Atherton. |
Water System Improvement Program
|
Bay Division |
|
|
|
7-miles of 72" diameter pipe in the East Bay and 9-miles of 60" pipe between Ravenswood Portal and the portal of of the Pulgas Tunnel. |
Water System Improvement Program
|
Bay Division |
|
|
|
Relocation of approximately 600 feet of each pipeline at the BART/railroad crossings. |
Water System Improvement Program
|
Bay Division |
|
|
|
Construction of a new tunnel which will link to existing segmentsof BDPL # 1 & 2 with the future BDPL #5 in the East Bay and Peninsula. |
Water System Improvement Program
|
Bay Division |
|
|
|
Make seismic improvements to valves, vaults and pipelines; and, install new pressure reducing valve. |
Water System Improvement Program
|
Peninsula |
|
|
|
Construct two new crossover / isolation valve vaults on eigher side of the Hayward Fault in Fremont |
Water System Improvement Program
|
Bay Division |
|
|
|
Phased clean up and restoration of water supply right-of-way, a former skeet shooting range. |
Other
|
Peninsula |
|
|
|
Reduce wastewater flow in the The Brotherhood Way/St. Charles Avenue area |
5-Year CIP
|
San Francisco |
|
|
|
Replace seismically unsafe dam by constructing new dam located downstream, and provide new reservoir with same storage capacity. |
Water System Improvement Program
|
Sunol Valley |
|
|
|
Improve seismically upgrade existing vault and relocate isolation valves |
Water System Improvement Program
|
Peninsula |
|
|
|
Connect the existing sewer system on Cayuga Avenue to College Hill Tunnel to maximize storm water storage on Cayuga Avenue and Milton Street |
5-Year CIP
|
San Francisco |
|
|
|
Make improvements to the interior and the exterior of the pump station |
Measure A/B
|
San Francisco |
|
|
|
The project will reduce wastewater odors in the Mission Bay neighborhood and improve the reliability of the pump station. |
5-Year CIP
|
San Francisco |
|
|
|
New seismically reinforced pump station; replace aging pumps, motors, & controls; + emergency power; & improve site security and water qual monitoring |
Water System Improvement Program
|
San Francisco |
|
Records: 1 - 20 of 95