Address leaks and associated water damage at: (1) Lower Crystal Springs Outlet Tower No. 1 and (2) Calaveras Outlet Tower.

Water System Improvement Program

Peninsula


Install required infrastructure to recapture water released from Calaveras Reservoir for fishery habitat enhancement.

Water System Improvement Program

Sunol Valley


Construct a fourth seismically-designed siphon through the Sunol Valley. Seismically retrofit Siphon #2 as needed.

Water System Improvement Program

Sunol Valley


Manage and maintain Alameda Watershed lands in responsible way, establishing a plan that sets guidelines, pratices for watershed care.

Environment

Bay Division


Rebuild Alemany Pump Station; and support the Supervisory Control and Data Acquisition (SCADA) project by adding automation.

Water System Improvement Program

San Francisco


Conduct detailed assessment of PCCP pipeline reaches, identify critically vulnerable sections and prioritize for rehabilitation

Water System Improvement Program

Bay Division


Add three additional crossover facilities along BDPL 3 and 4; one in Santa Clara, one in Palo Alto and one in Atherton.

Water System Improvement Program

Bay Division


7-miles of 72" diameter pipe in the East Bay and 9-miles of 60" pipe between Ravenswood Portal and the portal of of the Pulgas Tunnel.

Water System Improvement Program

Bay Division


Relocation of approximately 600 feet of each pipeline at the BART/railroad crossings.

Water System Improvement Program

Bay Division


Construction of a new tunnel which will link to existing segmentsof BDPL # 1 & 2 with the future BDPL #5 in the East Bay and Peninsula.

Water System Improvement Program

Bay Division


Make seismic improvements to valves, vaults and pipelines; and, install new pressure reducing valve.

Water System Improvement Program

Peninsula


Construct two new crossover / isolation valve vaults on eigher side of the Hayward Fault in Fremont

Water System Improvement Program

Bay Division


Phased clean up and restoration of water supply right-of-way, a former skeet shooting range.

Other

Peninsula


Reduce wastewater flow in the The Brotherhood Way/St. Charles Avenue area

5-Year CIP

San Francisco


Replace seismically unsafe dam by constructing new dam located downstream, and provide new reservoir with same storage capacity.

Water System Improvement Program

Sunol Valley


Improve seismically upgrade existing vault and relocate isolation valves

Water System Improvement Program

Peninsula


Connect the existing sewer system on Cayuga Avenue to College Hill Tunnel to maximize storm water storage on Cayuga Avenue and Milton Street

5-Year CIP

San Francisco


Make improvements to the interior and the exterior of the pump station

Measure A/B

San Francisco


The project will reduce wastewater odors in the Mission Bay neighborhood and improve the reliability of the pump station.

5-Year CIP

San Francisco


New seismically reinforced pump station; replace aging pumps, motors, & controls; + emergency power; & improve site security and water qual monitoring

Water System Improvement Program

San Francisco


Records: 1 - 20 of 95

Project List Page: 1, 2, 3, 4, 5


 
 
Visit sfgov.org the official site of the City and County of San Francisco
Copyright © 2009, San Francisco Public Utilities Commission

Privacy Policy  |   SFPUC Home  |   Site Index  |   Contact: Email & Phone