Project List
PROJECT TITLE 
DESCRIPTION
PROJECT FAMILY
LOCATION

Address leaks and associated water damage at: (1) Lower Crystal Springs Outlet Tower No. 1 and (2) Calaveras Outlet Tower.

Water System Improvement Program

Peninsula


Construct advanced disinfection facilities to comply with the upcoming drinking water regulations for secondary disinfection.

Water System Improvement Program

San Joaquin


Install required infrastructure to recapture water released from Calaveras Reservoir for fishery habitat enhancement.

Water System Improvement Program

Sunol Valley


Construct a fourth seismically-designed siphon through the Sunol Valley. Seismically retrofit Siphon #2 as needed.

Water System Improvement Program

Sunol Valley


Manage and maintain Alameda Watershed lands in responsible way, establishing a plan that sets guidelines, pratices for watershed care.

Environment

Bay Region


Rebuild McLaren Park pump station; and support the Supervisory Control and Data Acquisition (SCADA) project by adding automation.

Water System Improvement Program

San Francisco


Seismically retrofit BDPL Nos. 3 & 4 across the Hayward Fault.

Water System Improvement Program

Bay Region


Repair and upgrade to ensure the safe delivery of drinking water.

Other

San Francisco


Make seismic improvements to valves, vaults and pipelines; and, install new pressure reducing valve.

Water System Improvement Program

System-wide


Construct 21-mile Bay Division Pipeline #5, including a tunnel under SF Bay and adjacent marshlands.

Water System Improvement Program

Bay Region,
Peninsula


Construct three crossover facilities between Bay Division Pipelines Nos. 3 and 4.

Water System Improvement Program

Bay Region,
Peninsula


Phased clean up and restoration of water supply right-of-way, a former skeet shooting range.

Other

Peninsula


Reduce wastewater flow in the The Brotherhood Way/St. Charles Avenue area

5-Year CIP

San Francisco


Replace seismically unsafe dam by constructing new dam located downstream, and provide new reservoir with same storage capacity.

Water System Improvement Program

Sunol Valley


Connect the existing sewer system on Cayuga Avenue to College Hill Tunnel to maximize storm water storage on Cayuga Avenue and Milton Street

5-Year CIP

San Francisco


Make improvements to the interior and the exterior of the pump station

Measure A/B

San Francisco


New seismically reinforced pump station; replace aging pumps, motors, & controls; + emergency power; & improve site security and water qual monitoring

Water System Improvement Program

San Francisco


Plan, design & construct improvements to comply with State regulations regarding water transmission line mitigation of potential cross-connections.

Water System Improvement Program

San Francisco


Evaluate and upgrade Crystal Springs Reservoir outlets, pump station, Crystal Springs/San Andreas pipeline, and outlet facilities.

Water System Improvement Program

Peninsula


Replace portions of the Crystal Springs Pipeline No. 2 over the next 10 years.

Water System Improvement Program

Peninsula


Records: 1 - 20 of 93

Project List Page: 1, 2, 3, 4, 5


 
 
Visit sfgov.org the official site of the City and County of San Francisco
Copyright © 2008, San Francisco Public Utilities Commission

Privacy Policy  |   SFPUC Home  |   Site Index  |   Contact: Email & Phone