Project–At–A–GlanceWSIP Region Location Construction Start Construction Finish Current Status Project Cost |
|
The three existing Alameda Siphons are pipelines that connect two tunnels and cross under the Alameda Creek in the Sunol Valley. The siphons transmit water from both the Hetch Hetchy supply and the Sunol Valley Water Treatment Plant to the Bay Area, and thus provide an important link in the SFPUC Water Transmission system. They cross the Calaveras Fault in the Sunol Valley and are vulnerable to significant damage in a major seismic event. This proposed project would ensure the continued delivery of water in case of a major seismic event on the Calaveras Fault by installing a new seismically-designed fourth siphon and other upgrades to the siphons facilities. Description The proposed project would consist of:
Note: Schedule and cost information shown may vary from the 2007 Approved WSIP Schedule and Budget. The information shown reflects the current forecast information published in the latest WSIP Quarterly Report. | |
Contact Betsy Lauppe Rhodes at (415) 554-3240 or via email at blauppe@sfwater.org
Please find the Preliminary Initial Study/Mitigated Negative Declaration for the Alameda Siphons Seismic Reliability Upgrade Preliminary Project. Read more
Basic information regarding the SFPUC's proposed Alameda Siphon #4 Project can be found in the attached Fact Sheet from July 2006.
Read more