Project–At–A–GlanceWSIP Region Location Construction Start Construction Finish Current Status Project Cost |
|
The proposed project would include all facilities necessary to move water from the Upper Crystal Springs Reservoir, through the Lower Crystal Springs Reservoir to San Andreas Reservoir and, ultimately, to the Harry Tracy Water Treatment Plant Raw Water Pump Station. All of these facilities are located in very close proximity to the San Andreas Fault. The purpose of the project is to improve system reliability so that raw water will be supplied to the Peninsula’s water treatment plant as necessary to meet its sustainable capacity requirements. Description The project primarily would consist of:
Note: Schedule and cost information shown may vary from the 2007 Approved WSIP Schedule and Budget. The information shown reflects the current forecast information published in the latest WSIP Quarterly Report. | |
Contact Maureen Barry at (415) 554-3297 or via email at mbarry@sfwater.org